Building works day 26

End of the 4th week. Bifolds arrived and ready to be installed on Monday.  Kitchen is out, no water or light.  Plasterboarding almost complete and primed for plastering.  Garage door installed.

Building works day 21

Busy weekend finishing upstairs doors and filling borrowed lights ready for painting.

Monday and half the kitchen comes out. First fix electrics also progressing.

Work started raising the patio.  Aco drain installed

Building works day 17

Passed Building Control inspection in the morning.  Steel has been insulated and walls prepared for bifolds next week.

My job has been replacing bedroom doors upstairs.  Borrowed lights above doors have gone.

Building works day 16

A relatively quiet weekend. Work commenced installing the door frame to garage and piers for bifolds.  Building Control due to visit tomorrow (Weds).  Ian has been around helping lift the parquet flooring.

Building works day 9

After a weekend and Monday off, steel arrived Tuesday morning and span across bedroom/dining room now in place.  The Portaloo has also been replaced after the old one blew over in Saturdays wild storm.