Building works day 17

Passed Building Control inspection in the morning.  Steel has been insulated and walls prepared for bifolds next week.

My job has been replacing bedroom doors upstairs.  Borrowed lights above doors have gone.

Building works day 16

A relatively quiet weekend. Work commenced installing the door frame to garage and piers for bifolds.  Building Control due to visit tomorrow (Weds).  Ian has been around helping lift the parquet flooring.

Building works day 9

After a weekend and Monday off, steel arrived Tuesday morning and span across bedroom/dining room now in place.  The Portaloo has also been replaced after the old one blew over in Saturdays wild storm.

 

Building works day 3

First wall to go is between Bedroom 4 and the Hallway.

Plasterboard between Dining Room and Kitchen retained as a partial dust barrier.  Steel is now in place

View from the hall. We can now start to better imagine the new room overall size and shape.