Rays Wall Stage 1

The two pictures below show the original steps in their undermined state.

IMG_0094

IMG_0097

The adjacent retaining wall with its week lean mix make up.

IMG_0099

A profile board with nails at key positions for straining the building line in order to drop plumb bobs.

WallC-001

WallC-002

Shows the earlier attempt at retaining walls prior to becoming aware of the Retaining Walls Act; the engineer highlighted the fact this continuous excavation could increase the risk of land slip.

WallC-003

Shows the string line set to the far side of the wall.

WallC-004

The start of excavations for wall C

WallC-005

Gives an idea of how hard the ground is here. To aid progress I invested in a spade graft (pictured) and pick axe as nothing else would touch it.

WallC-007

Where to place spoils, without space it has to be moved around several times.

WallC-010

WallC-008

The profile board is set 100mm above the top of pour for easy alignment.

WallC-011

The toe excavation is 7 metres below the datum point.

WallC-012

Shows the profile board set 100mm above the wall height. We now access the dig by ladder, the house is beginning to seem a long way above.

WallC-013

A typical delivery. 10 tonnes of ballast with 3.3 tonnes of cement a ratio of 3:1.

WallC-014

Two layers of mesh with starter bars for the stem wall, each sheet of mesh weighs 125 Kg so  had to be cut to size prior to carrying to the rear.

WallC-015

The first slab poured leaving starter bars protruding ready for the vertical stem bars.

WallC-016

WallC-017

The shutter sides ready for positioning against the pre-cast kicker.

WallC-018

The shutters are connected with M16 stud in plastic conduit; the conduit will remain in the pour whilst allowing the removal and re-use of the stud.

WallC-019

WallC-020

Mixed concrete is delivered via a wooden chute next to the mixer.

WallC-021

Shows the missed section isolated between.

 

WallC-022

Can’t be sure Matt is enjoying the experience…

WallC-023

More mesh and starter bars and my steel tying is improving.

WallC-024

We have progressed to pre-lining our chute with DPM to make pouring easier.

WallC-025

Pouring a drainage plinth to enable water to escape.

WallC-026

A view of progress from toward the top of the patio.

WallC-027

Below gives an idea of the minimal space available at the near/house side.

WallC-028

Matt takes a welcome break; his feet are 6 meters above the lowest section of wall C.

WallC-029

Preparation for the middle missed section, again space is limited.

WallC-030

Digging out the middle section surrounded by starter bars, plenty of cuts & bruises from this.

WallC-031

The middle missed slab now ready for pouring.

WallC-032

Below shows the starter bars with the kicker up-stand for locking the shutters.

WallC-033

The steel cage ready for its weep hole tubes to be positioned.

WallC-034

The final shutters are now in place ready to pour.

WallC-035

WallC-036

Wall C completed with back & front filling to get rid of spoils.

WallC-037

WallC-038

Below shows the extended chute and an idea of how far the concrete is poured, we are now ready for the start of wall B, notice appropriate starter bars projecting from the end section.

WallC-029